Document library
Published: 05 February 2024
The files listed below are of significant size and may take a substantial amount of time to download depending on your internet connection.
You can view our consultation documents, including the brochure and Preliminary Environmental Information Report (PEIR) and materials to help you learn more about the River Thames Scheme.
- Statutory consultation documents
- PEIR Volume 1 - Non Technical Summary
- PEIR Volume 2 - Main report
- PEIR Volume 3 - Figures
- PEIR Volume 4 - Appendices
- Ongoing documents
- Non-technical summary
- Previous consultation documents
Statutory consultation documents
- Statutory consultation brochure (35MB, PDF)
- Statutory consultation brochure - easy read version, part 1 (4MB, PDF)
- Statutory consultation brochure - easy read version, part 2 (6MB, PDF)
- Statutory consultation brochure - easy read version, part 3 (12MB, PDF)
- Map Book Volume 1 (129MB, PDF)
- Map Book Volume 2 (100MB PDF)
- Integrated Scheme Description (40MB, PDF)
- Environmental Design Principles (PDF)
- Environmental effects of the River Thames Scheme: next steps (PDF)
- Statutory consultation feedback form (PDF)
- Statutory consultation feedback form - easy read version (10MB, PDF)
- Response to Matters Raised (3MB, PDF)
- Statement of Community Consultation (6MB, PDF)
- Section 47 notice (PDF)
- Section 48 notice (PDF)
- Section 48 notice (unregistered land interest) (PDF)
Statutory consultation - Preliminary Environmental Information Report (PEIR)
PEIR Volume 1 - Non Technical Summary
PEIR Volume 2 - Main report
- PEIR Volume 2 Cover and Contents (PDF)
- Chapter 1 - Introduction (PDF)
- Chapter 2 - Project Description (PDF)
- Chapter 3 - Consideration of Alternatives (PDF)
- Chapter 4 - Approach to Environmental Assessment (PDF)
- Chapter 5 - Site Description (PDF)
- Chapter 6 - Air Quality (PDF)
- Chapter 7 - Biodiversity (PDF)
- Chapter 8 - Climatic Factors (PDF)
- Chapter 9 - Cultural Heritage, Archaeology and Built Heritage (PDF)
- Chapter 10 - Flood Risk (PDF)
- Chapter 11 - Health (PDF)
- Chapter 12 - Landscape and Visual Amenity (PDF)
- Chapter 13 - Materials and Waste (PDF)
- Chapter 14 - Noise and Vibration (PDF)
- Chapter 15 - Socio-economics (PDF)
- Chapter 16 - Soils and Land (PDF)
- Chapter 17 - Traffic and Transport (PDF)
- Chapter 18 - Water Environment (PDF)
- Chapter 19 - Cumulative and in combination effects (PDF)
- Chapter 20 - Stakeholder engagement (PDF)
- Chapter 21 - Next Steps (PDF)
- Chapter 22 - References (PDF)
- Chapter 23 - Abbreviations (PDF)
- Chapter 24 - Glossary (PDF)
- Composite PEIR (6MB, PDF)
PEIR Volume 3 - Figures
- PEIR Volume 3 cover and contents (PDF)
- Figure 2.1 – Design of the River Thames Scheme (21MB, PDF)
- Figure 2.2 – Potential Construction Car Park Locations (5MB, PDF)
- Figure 2.3 – Public Rights of Way Affected by the Project (15MB, PDF)
- Figure 5.1 – Air Quality Study Areas (2MB, PDF)
- Figure 5.2 – Air Quality Management Areas (3MB, PDF)
- Figure 5.3 – 2019 Annual Mean NO2 Monitoring Results (2MB, PDF)
- Figure 5.4 – Biodiversity Study Area (40MB, PDF)
- Figure 5.5 – Climatic Factors Study Area (5MB, PDF)
- Figure 5.6 – Cultural Heritage Study Area (13MB, PDF)
- Figure 5.7 – Designated Heritage Assets (14MB, PDF)
- Figure 5.8 – Flood Risk Study Area (13MB, PDF)
- Figure 5.9 – 3.33% (1 in 30) Annual Chance Flood (16MB, PDF)
- Figure 5.10 – 1% (1 in 100) Annual Chance Flood (16MB, PDF)
- Figure 5.11 – 1% (1 in 100) Annual Chance Flood +35% Climate Change (17MB, PDF)
- Figure 5.12 – 0.1% (1 in 1000) Annual Chance Flood (17MB, PDF)
- Figure 5.13 – Combined Surface Water Flood Event (32MB, PDF)
- Figure 5.14 – Health Study Area (5MB, PDF)
- Figure 5.15 – 2019 English Census Wards (5MB, PDF)
- Figure 5.16 – Landscape and Visual Amenity Study Area (5MB, PDF)
- Figure 5.17 – Existing Green Infrastructure Connections (14MB, PDF)
- Figure 5.18 – Published Landscape Character Assessments (5MB, PDF)
- Figure 5.19 – Published Landscape Typology (4MB, PDF)
- Figure 5.20 – Public Rights of Way (15MB, PDF)
- Figure 5.21 – Materials and Waste Study Area (14MB, PDF)
- Figure 5.22 – Materials and Waste Baseline Information (14MB, PDF)
- Figure 5.23 – Noise and Vibration Study Area (4MB, PDF)
- Figure 5.24 – Socio-economics Study Area (16MB. PDF)
- Figure 5.25 – Population Density (4MB, PDF)
- Figure 5.26 – Recreational Receptors (14MB, PDF)
- Figure 5.27 – Indices of Multiple Deprivation (4MB, PDF)
- Figure 5.28 – Soils and Land Study Area (13MB, PDF)
- Figure 5.29 – Superficial Geology (12MB, PDF)
- Figure 5.30 – Bedrock Geology (12MB, PDF)
- Figure 5.31 – Soilscapes (13MB, PDF)
- Figure 5.32 – Agricultural Land Classification (13MB, PDF)
- Figure 5.33 – Traffic and Transport Study Area (5MB, PDF)
- Figure 5.34 – Surface Water Study Area (18MB, PDF)
- Figure 5.35 – WFD Waterbodies (22MB, PDF)
- Figure 5.36 – Groundwater Study Area (20MB, PDF)
- Figure 12.1 – Viewpoint locations (13MB, PDF)
- Figure 12.2 – Visual Receptor Locations (13MB, PDF)
- Figure 12.3 – Landscape Receptors (16MB, PDF)
- Figure 14.1 – Noise and Vibration Receptors and Survey Locations (24MB, PDF)
- Figure 17.1 – Materials Management Strategy Construction Routes (10MB, PDF)
- Figure 18.1 - Hydraulic Connections (3MB, PDF)
- Figure 19.1 - Cumulative Effects Assessment - Zones of Influence (3MB, PDF)
PEIR Volume 4 - Appendices
- PEIR volume 4 cover and contents (PDF)
- Appendix 2.1 - Verification of the PEIR outcomes against the Design for Stat Con (PDF)
- Appendix 2.2 – List of potentially affected Public Rights of Way (PDF)
- Appendix 4.1 – Responses to Scoping Opinion (PDF)
- Appendix 4.2 – Implementation status of mitigaiton for the PEIR Assessment (PDF)
- Appendix 5.1 – Environmental Baseline Surveys Completed to Date (PDF)
- Appendix 6.1 – Proposed Diffusion Tube Monitoring Survey Method (PDF)
- Appendix 6.2 – Criteria Used to Assess Dust Emissions Magnitude (PDF)
- Appendix 6.3 – Air Quality Significant and Non-Significant Effects Summary (PDF)
- Appendix 7.1 – Summary of Statutory and Non-Statutory Designated Nature Conservation Sites (PDF)
- Appendix 7.2 – Preliminary Ecological Appraisal (4MB, PDF)
- Appendix 7.2 - Figures - part 1 (43MB, PDF)
- Appendix 7.2 - Figures - part 2 (44MB, PDF)
- Appendix 7.2 - Figures - part 3 (45MB, PDF)
- Appendix 7.2 - Figures - part 4 (34MB, PDF)
- Appendix 7.3 – Terrestrial and Aquatics Invasive and Non-Native Species (INNS) Report (PDF)
- Appendix 7.3 - Figures (33MB, PDF)
- Appendix 7.4 – Great Crested Newt Survey Report 2023 (PDF)
- Appendix 7.4 - Figures (7MB, PDF)
- Appendix 7.5 – Macrophyte and Macroinvertebrate 2021 and 2022 Survey Report (PDF)
- Appendix 7.6 – Non-breeding Bird Survey Baseline Report 2022/23 Report (3MB, PDF)
- Appendix 7.6 - Additional figures (PDF)
- Appendix 7.7 – Habitat Regulations Assessment Hazard Identification and HRA Scope (PDF)
- Appenidx 7.7 - Figures (14MB, PDF)
- Appendix 7.8 – Reptile Survey Report 2023 (PDF)
- Appendix 7.8 - Figures (12MB, PDF)
- Appendix 7.9 – Biodiversity Significant and Non-Significant Effects Summary (PDF)
- Appendix 8.1 – Climatic Factors Significant and Non-Significant Effects Summary (PDF)
- Appendix 9.1 – An Assessment of the Settings of Heritage Assets Stage 1 and 2 (56MB, PDF)
- Appendix 9.2 – Stage 1 Evaluation Report (32MB, PDF)
- Appendix 9.3 – Stage 2 Trial Trench Evaluation Chertsey Abbey Meads Report (8MB, PDF)
- Appendix 9.4 – River Thames Stage 2 Trial Trench Evaluation: Desborough Island Report (9MB, PDF)
- Appendix 9.5 – River Thames Stage 2: Sunbury Weir and Teddington Weir Archaeological Test Pit and Auger Evaluation Report (5MB, PDF)
- Appendix 9.6 – Bed Lowering Downstream of Desborough Cut GI Monitoring Report (14MB, PDF)
- Appendix 9.7 – Cultural Heritage Significant and Non-Significant Effects Summary (PDF)
- Appendix 10.1 – Flood Risk Significant and Non-Significant Effects Summary (PDF)
- Appendix 11.1 – Baseline Health Conditions (PDF)
- Appendix 11.2 – Reference Sources (PDF)
- Appendix 11.3 – Health Significant and Non-Significant Effects Summary (PDF)
- Appendix 12.1 – Scope of Lighting Impact Assessment (PDF)
- Appendix 12.2 – LVIA Significant and Non-Significant Effects Summary Tables (PDF)
- Appendix 13.1 – Materials and Waste Significant and Non-Significant Effects (PDF)
- Appendix 14.1 – Noise Survey Report (PDF)
- Appendix 14.2 – Noise and Vibration Significant and Non-Significant Effects (PDF)
- Appendix 15.1 – Land Use and Agricultural Baseline DBA (PDF)
- Appendix 15.1 - Figures - part 1 (45MBPDF)
- Appendix 15.1 - Figures - part 2 (44MB, PDF)
- Appendix 15.1 - Figures Part 3 (19MB, PDF)
- Appendix 15.2 – NMU Survey Report (4MB, PDF)
- Appendix 15.2 - Figures (5MB, PDF)
- Appendix 15.3 – Socio-economics Significant and Non-Significant Effects (PDF)
- Appendix 16.1 – Soils and land Significant and Non-Significant Effects Summary (PDF)
- Appendix 17.1 – Transport Assessment Scoping Report (PDF)
- Appendix 17.2 – Two Way HGV Flow by Construction Route (PDF)
- Appendix 17.3 – Traffic and Transport Significant and Non-Significant Effects (PDF)
- Appendix 18.1 – Preliminary WFD Assessment (4MB, PDF)
- Appendix 18.1 - Figures (30MB, PDF)
- Appendix 18.2 – Receptor Sensitivity Table (PDF)
- Appendix 18.3 – Water Environment Significant and Non-Significant Effects (PDF)
- Appendix 19.1 – Long List of 'Other Developments' (PDF)
Ongoing documents
- Overview of scheme map (PDF)
- Landscape and Green Infrastructure overview map (PDF)
- Event information banners (81MB, PDF)
Non-technical summary
Previous consultation documents
- Non-statutory consultation summary report (PDF)
- Non-statutory consultation brochure (PDF)
- Lower Thames Flood Risk Management Strategy - Consultation document (PDF)
- Lower Thames Flood Risk Management Strategy - summary of comments and responses to consultation (PDF)
Document history
Published: 05 February 2024
Updated: 08 February 2024